Case Study

Priority Dispatch

Salt Lake City, UT

Sustainable Operations Plan

Priority Dispatch Summary

Priority Dispatch building is a 9 story, 72,000 SF office building in downtown Salt Lake City. It is owned and occupied by Priority Dispatch.

Project Summary

Priority Dispatch scored a 6 out of 100 for Energystar prior to beginning their modifications. As an environmentally conscious company, Priority has replaced all interior lighting with LED’s, installed cutting edge lighting controls, tinted older windows to control heat gain, addressed a leaking hot water distribution system, replaced all primary air handling valves, upgraded the DDC controls system eliminating all pneumatic controls, installed high efficiency elevators, correct power quality issues and optimized the programming of the automated building control system.

Savings Summary

Annual Savings: $40,000/Yr

Electric Use Reduced: 495,000 kWh/Yr

Simple ROI: Less than 7 Years

Utility Rebates: Over $65,000+

Carbon Reduction: 351

Contact Info

Ray Wilcox

801-989-8375 – (Cell)
ray@luxenergygrp.com

Abe Millet

801-989-7806- (Cell)
abe@luxenergygrp.com

Lux Energy Group

1111 South 120 East
Farmington, UT 84025